Water tanks - store up to 600 units of surplus water per tank to cover interruptions or a temporary deficit. Available through Water Storage at milestone 2. Disconnected tanks keep their water until road access returns.
Industrial components workshop - produces as many components as three ordinary factories from the same steel and wiring, with fewer workers and higher power use. Available through Automated Components at milestone 9.
Rock clearance - clear the D4 spur, southwest C3 butte and eastern E4/F4 passage on Morne. Inspect the area, then place a temporary camp nearby and supply its materials and builders. Available after researching Industrial Machinery at milestone 6.
Connection previews - drawing a link to an isolated district now highlights all the buildings that will regain road access, including those farther along the network. Buildings waiting for road plans are shown separately.
Road removal - before demolition, the preview shows which buildings will lose road access and which conveyors may be affected by losing their road support.
Obstacle markers - blocked road previews mark the rock, building or crossing that stops the route. Clearable rock names its clearance area.
Isolated roads - a valid road that will remain disconnected now says so in the preview. You can still place it for later use.
Overlong routes - the refusal now recommends shorter sections and shows your repeat-placement binding, instead of suggesting a waypoint the tool cannot place.
Construction details - fixed the bottom of long construction sheets being cut off at large interface sizes.