The baths rebuilt and a proper roulette table

31 October 2026
Areas
23 changes in this update

Improved

14 changes
Picture
  • Full texture sharpness - Every painted texture now shows at its real size. Fish skins, signs, labels and the people had been drawn at a half or a quarter of it

Baths
  • The first bath's hall - Beams now stand on the columns, with the lamps and high windows in the bays between them

  • Windows - Set back into the walls of the first bath, the sitting room and the winter garden, with frames and sills

  • Ceiling lamps - A new fitting fixed flat to the ceiling, with a softer glow

  • Return ducts - Flanged lengths on hangers, with grilles, running from wall to wall

  • Pool ladders - New stainless ladders with curved rails and treads below the deck

  • Winter garden - New dead trees in tiled troughs, and roof ribs that reach the ceiling

  • Sitting room - Curtains hang in soft folds from a rail, and the window's light falls into the room

  • Service bath - Round painted pipes with clips, collars and valve stems

  • Tackle counter - A modelled till and real spools of line

  • Tile bands - The blue band and the skirting now carry on round the corners

Roulette
  • The table - Rebuilt with a padded rail, one green baize across the whole table and a sharp printed layout

  • The wheel - A new bowl, ball track, numbered ring and chrome turret

  • Table light - Two lamps along the table, so the light reaches both ends

Fixed

9 changes
Baths
  • Lamp in the roulette room's doorway - Moved just inside the room

  • Curtains through the window sill - They now hang clear of it

  • Windows behind the ducts - The ducts and high windows no longer cross

  • Ducts stopping short of the walls - They now run on through the wall

  • Lamps running into columns - Every lamp has its own clear bay

  • Pale boxes around lamps - The glow no longer cuts across nearby ceilings and columns

  • Laundry pipes - Moved out from under the lamps, and run through the end walls

  • Last platform - The roof beams reach the ceiling, and the far panel sits against its wall

  • Pool deck - Removed the green dashes, and the depth marking no longer sits on the drain