The later baths rebuilt
4 November 2026
Areas
5 changes in this update
The Therapy bath - Rebuilt as a hydrotherapy pool: beams on tiled pillars, lamps between them, steps down into the far end of the pool with handrails, a hoist over the water, a wheelchair, a treatment couch and a rack of floats
The Service bath - Rebuilt as the pool's plant room, with control cabinets and their gauges, two pumps feeding a pipe along the wall, and a sand filter
The Night Laundry - The washing machines stand four to a bay between the pillars, with folding tables, and the pipes rest on racks hung from the beams
The Last Platform - Cast iron columns now carry the canopy, and a two faced clock hangs from it
The Winter Garden - The roof ribs no longer land in the middle of the windows: they stand on posts between them